How We Work
Our Design Process
From first conversation to permit-ready drawings — here's exactly what to expect when you work with ruddDesigns. Transparent, collaborative, and built around your vision.
Week 1
01Initial Consultation
- ✓In-depth discussion of your vision, lifestyle, and goals
- ✓Review of site conditions, lot size, and orientation
- ✓Preliminary budget and scope conversation
- ✓Introduction to neighborhood design guidelines (if applicable)
- ✓Establish project timeline and communication plan

Weeks 1–2
02Predesign & Site Study
- ✓Topography, soil, and environmental assessment
- ✓Zoning and building code review
- ✓Flood plain and wind load analysis
- ✓Neighborhood pattern book / design guide review
- ✓Feasibility confirmation and refined scope

Weeks 3–8
03Concept Design
- ✓Schematic floor plans and elevations
- ✓3D renderings using Chief Architect
- ✓Client review sessions and design iterations
- ✓Preliminary approval submission (exclusive communities)
- ✓Finalize design direction

Weeks 9–16
04Construction Documents
- ✓Detailed architectural drawings
- ✓Structural, mechanical, and electrical coordination
- ✓Florida Building Code compliance documentation
- ✓Permit-ready drawing set
- ✓Final delivery — typically 4 months from kickoff

Typical Timeline: 4 Months
Most projects go from signed contract to permit-ready drawings in approximately 16 weeks. Complex sites or exclusive community approvals may add time.